It's happening again at the MBTA.
Mac Daniel reports on the disaster that has become the Blue Line fleet replacement.
This comes on the heels of the Green Line fleet replacement fiasco, the Silver Line's failure to fully exist, and the Green Line extension falling about a decade behind schedule.
This agency really has bad luck.
This comes on the heels of the Green Line fleet replacement fiasco, the Silver Line's failure to fully exist, and the Green Line extension falling about a decade behind schedule.
This agency really has bad luck.




0 Comments:
Post a Comment
Links to this post:
Create a Link
<< Home